Tile-roofed homes and palms along a Fort Myers street
KestrelRoofing(239) 555-0156

Fort Myers · March 2026

Whiskey Creek

The letter came in January.

The roof went on in 2005, the year after Charley. Twenty-one years later the insurer wrote to say it would not renew unless the roof was replaced or shown to have five years left.

We inspected it that week. The tile was sound. The felt beneath it was brittle at every valley and had already let water into the deck in two places. We wrote that down, with photos, and the owners chose to replace it before the renewal date.

Roof
Concrete barrel tile
Old roof
2005, after Charley
Size
44 squares
On site
9 working days
Decking replaced
6 sheets
Permit closed
March 19, 2026

Nine working days

  1. A roofer in a harness climbing onto a tile roof

    March 3 and 4

    Tear-off. The felt under the valleys came up in pieces, and six sheets of plywood were replaced at the per-sheet price in the quote. The deck was re-nailed and sealed, and the county inspector signed off the next afternoon.

  2. A roofer setting tile beside stacks of tile

    March 5 to 12

    New valley metal and drip edge, then tile from the eave up.

  3. A finished field of tile under a clear sky

    March 13

    Ridges fixed, yard swept with the magnet, photo file sent to the insurer.

From the homeowner

The insurer gave us sixty days. Grant had his report to them inside a week and the new roof on before the renewal date.

Marianne D.Google review, March 2026

How a tile re-roof goesMore recent roofs

Have us look at it.

A roof inspection with photos and a written report. If it has five years left, we’ll say so.

Grant Tolliver, owner of Kestrel Roofing

Grant answers this one himself.(239) 555-0156

What’s going on