The build
Eighteen weeks, more or less.
This is where they go.
Design and engineering
Adrian measures the site at dusk and draws the pool against your survey, in plan and in three dimensions. A structural engineer stamps the drawings. You approve one set, and that set is what gets built.

Community review
Most architectural review boards answer within thirty days. We assemble the package, present it, and carry any conditions back into the drawings.
Permit
Collier County typically reviews a complete pool application in 15 to 25 business days, Lee County in 20 to 35. We file, answer the reviewer and record the notice of commencement.
Layout and dig
The pool is painted on the ground and you walk it before a machine arrives. The dig takes a day or two. Groundwater here sits two to five feet down, so pumps run from the first bucket until the shell is in.

Steel and plumbing
A cage of reinforcing steel is tied to the engineer's schedule, with the plumbing, the light niches and the bonding wire. The county inspects the steel and the bonding before any concrete is ordered.

Shell
The shell is shot in a day. We keep it wet for the first week and it goes on curing for twenty-eight days, while the tile and the deck are built around it.
Tile and coping
Waterline tile and coping stone are set by the same two people on every Evenfall pool. A raised spa adds about a week of their time.

Deck and equipment
Stone goes down over a compacted base while the pumps, filter, heater and controls are set and wired. An outdoor kitchen is built alongside and takes about three weeks.

Screen cage
A cage is engineered and permitted on its own and is raised once the deck is finished. Picture-window panels keep the long view open.

Interior finish
Pebble or quartz is troweled by hand in a single day, and the hose goes in that afternoon. To pass final inspection the pool needs an enclosure, a four-foot barrier, an approved cover or alarms on the doors that open to it.
Fill and start-up
We brush the new finish three times a day for the first three days and twice a day for the ten after that, and balance the water daily. You swim at the end of the week. The heater waits fourteen days and salt twenty-eight, which is also when the water settles into its final color.

Asked on every first visit
- Can you build while we are up north?
- Most of our pools are built that way. You get photographs every Friday and a call at each inspection. A summer build runs through the rainy season, which usually adds two or three weeks.
- What does an Evenfall pool cost?
- Projects start around $150,000 for the pool, the deck and the lighting. A spa, a cage or a kitchen is priced from the drawing, and the number in the contract is the number you pay unless you change the drawing.
- Cage or open?
- A cage keeps out leaves and insects and counts as the safety barrier. An open pool gives you the sky, and needs a fence, a cover or door alarms instead. Two of every three we build are open.
- Who is on site?
- Our own superintendent, every working day. The tile setters, the steel crew and the finish crew have been the same people since 2014.
We were in Michigan for all but two weeks of it. The Friday photographs were the best part of our summer, and the pool was full the week they said it would be.