For about forty years one gate stood between these canals and the river. It came out on June 17, 2025.

What changed
The Chiquita Lock sat at the mouth of the South Spreader, beside Cape Harbour, and every boat from the southwest canals went through it one at a time. On a Saturday in season it was the longest part of the trip.
Hurricane Ian left the gates stuck open in 2022. The city took the structure out in the spring of 2025, closing the waterway on April 1 and finishing on June 17, ahead of an 81-day schedule. Boats now run straight from the spreader to the river.
What remains is restoration. By that summer the city had planted more than a thousand of three thousand planned mangroves and was waiting on a federal permit for oyster reef balls. Shallow spots are still reported near the old lock site.
- 1980sLock built
- Sept 2022Ian jams it open
- April 1, 2025Waterway closes
- June 17, 2025Lock removed
The bridges stayed
These are the fixed spans over the southwest’s saltwater canals, measured by the city at mean high water. A spring tide takes inches off every one of them.
One more line overhead is on no bridge list. A power line crosses the spreader near the west end of Cape Coral Parkway at thirty-five to forty feet, and it matters to exactly one kind of buyer.