We buildthe edge.
Seawalls, docks and boat lifts for canal lots in Cape Coral and Fort Myers. One crew, two barges and an engineer's seal on every job since 1996.
- 612
- Seawalls set
- 1,480
- Lifts hung
- 40,000LB
- Largest lift
- 1996
- On the water since
Seawalls
Precast concrete panels five inches thick, tied back every ten feet and capped in one pour. Built to the 2021 Cape Coral standard and sealed by our engineer.
5,000 PSI

Docks
Timber or concrete piles under composite or ipe. We draw it to what your canal allows: a quarter of its width, and never more than 40 feet.
25 % of canal

Boat lifts
Four-pile lifts from 4,500 to 20,000 pounds and eight-pile lifts to 40,000. Aluminum beams and stainless cable on ten-inch piles.
40,000 LB

Size your lift.
Dry weight is the boat as it left the factory. Add fuel at 6.1 pounds a gallon, add your gear, add 20 percent, then go up to the next lift that is built.
9,000LB lift
- Piles
- 4
- Loaded
- 7,115 LB
- With 20%
- 8,538 LB
Job log.

25-041
Rubicon CanalCape Coral
A 1968 wall replaced in precast concrete, with a new dock and a four-pile lift.
- 92 LF
- 16,000 LB

25-018
Town & RiverFort Myers
An eight-pile lift for a 38-foot express, set off a concrete dock.
- 30,000 LB
- 8 PILES

24-112
PelicanCape Coral
A vinyl-faced wall poured in front of the original, 14 inches waterward.
- 80 LF
- 14 IN

24-087
St. James CityPine Island
A dock and lift lost to Ian, rebuilt in the same place at the same size.
- 510 SF
- 12,000 LB

24-055
Yacht ClubCape Coral
A corner lot on two canals. New wall, cap raised 24 inches.
- 168 LF
- 24 IN
The permit is
the long part.
A seawall needs a state exemption, a federal sign-off and a city permit before a panel moves. We file all three the week you sign and cast your panels while the paper is out.
13 weeks from signature to final inspection on an 80-foot wall.
City inspections: panels, cap and tie-backs, final.

I'm on the barge for every panel we set. If I wouldn't put it behind my own house, it doesn't go behind yours.
Wes Garrity Owner, licensed marine contractor
- 14
- On the crew, none subcontracted
- 2
- Barges, the Irene and the Dolly

They told us thirteen weeks in March and handed us the final inspection in week twelve. Nobody else would even give us a date.
Carol and Jim P. Seawall, dock and lift, Rubicon Canal
Google review, June 2025
Ian took the dock and bent the lift. Ironwood rebuilt both where they stood, and the new lift holds our 32 with room to spare.
Marcus T. Dock and lift, St. James City
Google review, January 2025
Walk the wall
with us.
A site visit takes about 40 minutes. Wes or Luis probes the wall, sounds the canal and sends a written price within the week.
(239) 555-0139Monday to Friday, 7 to 4