IronwoodMarine
Construction
A canal at dusk with boats on lifts at private docks and homes mirrored in still water

We buildthe edge.

Seawalls, docks and boat lifts for canal lots in Cape Coral and Fort Myers. One crew, two barges and an engineer's seal on every job since 1996.

612
Seawalls set
1,480
Lifts hung
40,000LB
Largest lift
1996
On the water since
01

Seawalls

Precast concrete panels five inches thick, tied back every ten feet and capped in one pour. Built to the 2021 Cape Coral standard and sealed by our engineer.

5,000 PSI

A concrete seawall and its cap running along the water
02

Docks

Timber or concrete piles under composite or ipe. We draw it to what your canal allows: a quarter of its width, and never more than 40 feet.

25 % of canal

The end of a dock on four piles, with two chairs facing the water
03

Boat lifts

Four-pile lifts from 4,500 to 20,000 pounds and eight-pile lifts to 40,000. Aluminum beams and stainless cable on ten-inch piles.

40,000 LB

A center console raised clear of the water on a pile-mounted boat lift

Size your lift.

Dry weight is the boat as it left the factory. Add fuel at 6.1 pounds a gallon, add your gear, add 20 percent, then go up to the next lift that is built.

9,000LB lift

Piles
4
Loaded
7,115 LB
With 20%
8,538 LB
9,000 LBMHHW +1.3 FTMLLW 0.0 FT51026 FT
Price this lift

Job log.

  1. Docks and boat lifts along a seawall, seen from the air

    25-041

    Rubicon CanalCape Coral

    A 1968 wall replaced in precast concrete, with a new dock and a four-pile lift.

    • 92 LF
    • 16,000 LB
  2. A center console with four outboards on a lift beside a dock

    25-018

    Town & RiverFort Myers

    An eight-pile lift for a 38-foot express, set off a concrete dock.

    • 30,000 LB
    • 8 PILES
  3. A new white seawall cap curving around a lawn

    24-112

    PelicanCape Coral

    A vinyl-faced wall poured in front of the original, 14 inches waterward.

    • 80 LF
    • 14 IN
  4. A covered boat on a lift at the end of a small dock

    24-087

    St. James CityPine Island

    A dock and lift lost to Ian, rebuilt in the same place at the same size.

    • 510 SF
    • 12,000 LB
  5. A house on a point with water on two sides and a dock at the corner

    24-055

    Yacht ClubCape Coral

    A corner lot on two canals. New wall, cap raised 24 inches.

    • 168 LF
    • 24 IN

The permit is
the long part.

A seawall needs a state exemption, a federal sign-off and a city permit before a panel moves. We file all three the week you sign and cast your panels while the paper is out.

13 weeks from signature to final inspection on an 80-foot wall.

Survey and sealed engineering3 weeks
3 weeks
Florida DEP exemption30 days
30 days
Army Corps of Engineerswith the state filing
with the state filing
Panels cast and cured6 weeks
6 weeks
City of Cape Coral permit2 to 4 weeks
2 to 4 weeks
Barge on site3 weeks
3 weeks

City inspections: panels, cap and tie-backs, final.

Wes Garrity, owner of Ironwood Marine Construction

I'm on the barge for every panel we set. If I wouldn't put it behind my own house, it doesn't go behind yours.

Wes Garrity Owner, licensed marine contractor

14
On the crew, none subcontracted
2
Barges, the Irene and the Dolly
A crane barge with its work lights on and a tug alongside at dusk

Walk the wall
with us.

A site visit takes about 40 minutes. Wes or Luis probes the wall, sounds the canal and sends a written price within the week.

(239) 555-0139Monday to Friday, 7 to 4

Site visit

What needs work